Case Studies for Project Management Solutions – World Leading Companies Trust TPG

The Project Group has been an internationally active company of project management experts for over 25 years. We offer consulting and solutions for your enterprise-wide project management to customers from a wide range of industries. Our focus are Microsoft technologies and their integration with ERP, Workmanagement, CRM and any other systems.

See TPG Case Studies

 

We have advised and developed suitable IT solutions for the following industries and international companies (excerpt from customer list):


Aerospace and Defense

  • Airbus (DE, FR, FI)
  • BAE Systems (UK)
  • Eurofighter (DE, UK)
  • Heggemann (DE)
  • Hensoldt (DE)
  • Meggitt (UK, USA, CH)
  • QinetiQ (UK)
  • Rheinmetall (CH, DE, AT)
  • TDW (DE)

Automotive

  • Alois Kober (DE)
  • Dürr (DE)
  • Edscha (DE)
  • Harman International (DE)
  • Intercable (IT)
  • Lotus Cars (UK)
  • Ronal Group (CH)

Engineering and Construction

  • ABB (CH, DE)
  • Deutsches Elektronen Syn. (DE)
  • GNS Ges. für Nuklar-Service (DE)
  • Künzli Davos (CH)
  • Liebherr (DE, FR, AT, CH)
  • Lürrsen Werft (DE)
  • MAN Diesel & Turbo (DE)
  • Marti (CH)
  • MRV Engenharia e Particip. (BR)
  • Paul Scherrer Institut (CH)
  • Siemens (DE, CH)
  • Thyssen-Krupp Marine Serv. (DE)
  • Thyssen-Krupp Uhde (DE)

Life Sciences and Chemicals

  • Fresenius (DE)
  • H&T Presspart Marsberg (DE)
  • Kemira (FI)
  • Novartis (CH)
  • Novo Nordisk (DK)
  • Rentschler Biotechnologie (DE)
  • Sandler Group (DE)

Telecommunication and IT

  • Derivco (ZA)
  • Die Post (CH)
  • ELM Information Securities (SA)
  • Microsoft (CH)
  • NTT Data (ZA)
  • Swisscom (CH)

Industrial Machinery and Components

  • ABB (CH, DE)
  • BSH Hausgeräte (DE)
  • Braunschw. Masch.bauanst. (DE)
  • Comer Industries (IT)
  • Conductix Wampfler (FR)
  • FRICKE Group (DE)
  • Gerresheimer (DE)
  • Greencells (DE)
  • Heggemann (DE)
  • Karl Storz (DE, US)
  • KNOLL Maschinenbau (DE)
  • Leopold Kostal (DE)
  • Messer Cutting Systems (DE)
  • Nobilia (DE)
  • Otto Bock Healthcare (DE)
  • Schunk (DE)
  • Trafag (CH)
  • TURCK Electronics (DE)
  • Ultra Maritime (UK)
  • Vaillant (DE)
  • Vorwerk (DE)
  • Weig Holding (DE)

Health Care

  • DSM (CH)
  • Kantonsspital Aarau (CH)
  • Schweizer Paraplegiker Zentrum (CH)
  • Swiss Trop. & Pub. Health Inst. (CH)
  • Sympany (CH)
  • Universitätsspital Zürch (CH)

Financial Services

  • Baloise Group / Basler Vers. (CH)
  • Bausparkasse Mainz (DE)
  • First National Bank (ZA)
  • Kaiser & Partner Privatbank (CH)
  • KPMG (CH)
  • South African Reserve Bank (ZA)
  • Willis Towers Watson (DE)

Utilities, Energy, Oil and Gas

  • Aziende Industriali di Lugano (CH)
  • BKW (CH)
  • Companhia Paulista De Força E Luz (BR)
  • Energie360° (CH)
  • IWB (CH)
  • Open Grid Europe (DE)
  • Primeo Energie (CH)
  • Qatargas (QA)
  • Saudi Aramco (SA)
  • SWU Stadtwerke Ulm/Neu-Ulm (DE)
  • Swissgrid (CH)
  • Uniper (DE)

Public Sector

  • Akademie Bay. Genossensch. (DE)
  • Berner Fachhochschule (CH)
  • Bundesbeschaffungsges. (AT)
  • Dep. of Agriculture, Food and the Marine (IE)
  • Genossenschaftsverb. Bayern (DE)
  • Limpopo Provincial Gov. (ZA)
  • Max-Planck Institut (DE)
  • NATS (UK)
  • Stadt Zürich (CH)
  • Tiefbauamt Zürich (CH)
  • Western Cape Government (ZA)

Retail and Consumer Goods

  • Bell Group (CH)
  • Coop (CH)
  • Einkaufsbüro Dt. Eisenhändler (DE)
  • Emmi (CH)
  • Euronics (DE)
  • Kerry Group (IE)
  • Läderach (CH)
  • Migros (CH)
  • REWE Group (DE)
  • Rotkäppchen-Mumm (DE)
  • Sonepar (DE)
  • SPAR South Afrika (ZA)

Travel and Transportation

  • Die Zentralbahn (CH)
  • Essener Versorgungs- & Verkehrsges. (DE)
  • Irish Rail (EI)
  • NATS Holding (UK)
  • Streck Transporte (CH)
  • Transnet (ZA)

Other Industries

  • Berner Fachhochschule (CH)
  • Careum (CH)
  • Plansee (AT)
  • Stora Enso (FI, SE, CN)
  • Tama Group (IS)

Case Studies for TPG Project Management Solutions

Industry
- Semiconductor
 

Department
- Development project

Solution Components
- TPG ProjectPowerPack

> Read Case Study

Industry
- Traffic, Construction, Infrastructure

Department
- Infrastructure and CEO Office

Solution Components
- TPG ProjectPowerPack

> Read Case Study

Industry
- IT Service Provider

Department
- PMO

Solution Components
- TPG ProjectPowerPack
- TPG PSLink

> Read Case Study

Industry
- Air Traffic Control

Department
- Programme Mgt Office

Solution Components
- TPG TeamManager
  (CoReSuite)

> Read Case Study

Industry
- Consulting

Department
- PMO

Solution Components
- TPG ProjectPowerPack
- TPG Scheduler

> Read Case Study

Industry
- Automotive and Electrical

Department
- PMO

Solution Components
- TPG ProjectPowerPack
- Project for the Web

> Read Case Study

Industry
- Consumer Electronics

Department
- PMO

Solution Components
- TPG ProjectPowerPack
- Project for the Web
- Microsoft Power BI

> Read Case Study

Industry
- Energy Industry

Department
- Project Management Office

Solution Components
- Project Online
- TPG QuickStart
- TPG ReportPack
- TPG TeamManager

> Read Case Study

Industry
- Healthcare

Department
- IT

Solution Components
- TPG ProjectPowerPack
- Project for the Web

> Read Case Study

Industry
- Energy / Manufacturing

Department
- Production Planning
- Maintenance / Repair (MRO)

Solution Components
- Microsoft Project Server
- TPG PSLink
- TPG ProjectLink

> Read Case Study

Industry
- Aerospace

Department
- Aircraft
- Space
- Defense Systems
- Electronics

Solution Components
- Planisware Enterprise V6

> Read Case Study

Industry
- Security and defense

Department
- Sensor technology

Solution Components
- Microsoft Project Server
- Microsoft SharePoint
- TPG PSLink (Jira Integration)
- Microsoft Power BI

> Read Case Study

Industry
- Pharmaceutical Industry

Department
- Project Management

Solution Components
- Project Online
- SharePoint Online
- TPG QuickStart
- TPG TeamManager

> Read Case Study

Industry
- Automotive

Department
- Building
- Construction
- Engineering

Solution Components
- MS Project Server
- MS SharePoint Server
- TPG PSLink
  (SAP Integration)

> Read Case Study

 

Industry
- Warehouse and Logistics Systems

Department
- Project Management

Solution Components
- MS Project Online
- TPG QuickStart
  (Pre-packaged solution)

> Read Case Study

 

Industry
- Industrial gases
- Engineering

Department
- Investment Projects

Solution Components
- MS Project Online

> Read Case Study

 

Industry
- Engineering
- Construction
- Manufacturing

Department
- Components

Solution Components
- Microsoft Project Server
- Microsoft SharePoint
- TPG ProjectLink
  (Multi-Project Mgt.)

> Read Case Study

Industry
- Construction
- Engineering

Department
- Product Development
- Engineering Services

Solution Components
- MS Project Server
- MS SharePoint Server
- TPG QuickStart
  (Pre-packaged solution)

> Read Case Study

Industry
- Energy

Department
- Project Delivery

Solution Components
- MS Project Server
- TPG PSLink
  (SAP Integration)
- TPG ResourceLink
- TPG TeamManager
  (Resource Planning)

> Read Case Study

Industry
- Food

Departments
- IT
- Marketing / HR
- Production Planning
- Product Development

Solution Components
- MS Project Server
- Microsoft SharePoint
- Custom Reports

> Read Case Study

Industry
- Medical Engineering

Department
- Product Development

Solution Components
- MS Project Server
- MS SharePoint Server
- TPG PSLink
  (Integration SAP)
- TPG ResourceLink
- Many Custom Reports

> Read Case Study

Industry
- Automotive
- Electronics

Department
- Engineering

Solution Components
- Microsoft Project Server
- Microsoft SharePoint
- TPG PSLink
  (SAP Integration)
- TPG ResourceLink

> Read Case Study

Industry
- Automotive

Department
- Precision Engineering

Solution Components
- MS Project Server
- MS SharePoint Server
- TPG PSLink
  (SAP Integration)
- TPG ProjectLink
  (Multi-Project Mgt.)

> Read Case Study

Industry
- Heating / AC / Ventilation

Department
- R&D

Solution Components
- MS Project Server
- MS SharePoint Server
- TPG PSLink
  (Integration SAP)
- TPG ProjectLink
  (Multi-Project Mgt.)

> Read Case Study

Industry
- Aerospace
- Defence
- Energy

Department
- Engineering

Solution Components
- Project Online
- Microsoft Power BI
- TPG PSLink
  (SAP Integration)

> Read Case Study