The world's leading MS Project SAP integration

TPG PSLink® 2010 - highly configurable and quickly installed

TPG PSLink is the world’s leading and SAP certified product for the integration of Microsoft Project Server and SharePoint with SAP (modules like PS, PM, CATS and others). The product was first released over 12 years ago, and since then has evolved and improved.

TPG PSLink is very rapidly implemented - in just a few days! This is possible due to its extensive configuration options making this proven product unparalleled in comparison with other solutions.

TPG PSLink: the benefits of SAP data exchange

Simplifies multiple tasks with streamlined, end-to-end project management processes

Integrated project planning, cost accounting, collaboration and document management

Eliminates need to manage data in 2 different systems

Improved data quality for project leaders, accounting staff and management

Multitenancy-enabled

Mobile use of SAP data

Extensive configuration options and checking mechanisms

TPG PSLink enables the bidirectional data exchange between Microsoft Project and SAP. With its extensive checking mechanisms, this TPG product ensures the complete consistency of all of the shared data in the participating systems.

An analysis of differences shows the changes in the data before they are written to the other system – and only these changes are transferred. 

 

diagram
SAP cert Logo

A SAP certified product since 2009

The SAP Certification dated May 2009 is based on a scenario comprising seven central use cases with more than 40 business function calls. The scenario covers the functionalities within WBS structures, networks, maintenance orders, primary and secondary cost planning, CATS time sheets, CO allocation document postings, and actual cost synchronization. In addition, the performance of the integration product was validated for mass data interchange.


SAP certified integration with the following SAP components:

  • Work Breakdown Structure (WBS) elements
  • Forecasts, Primary and secondary costs
  • Network objects
  • Plant Maintenance (PM) Orders and Operations
  • Cross Application Time Sheets (CATS)
  • Controlling (CO) Documents

TPG PSLink also prooved its full compatibility with Microsoft Windows Server 2008 R2 and with Windows 7 in comprehensive checkings.

Tens of thousands of projects are run by this integration product

What sets the highly configurable product TPG PSLink apart from other SAP PS/PM integration solutions is the number and scale of successful implementations. Tens of thousands of projects worth billions of pounds and spanning decades use TPG PSLink.


Engineering and manufacturing firms use TPG PSLink

TPG have a growing number of TPG PSLink customers all over the world, ranging from small scale implementations to large global projects. Multi billion pound projects within the aerospace and defense sector are running MS Project with TPG PSLink integrating into SAP PS.

And there are lots of big implementations in many other sectors as well. Large scale engineering and manufacturing firms use the product to integrate Microsoft Project with the SAP Plant Maintenance Module, scheduling and resourcing millions of tasks per year.

Such is TPG’s relationship with our clients that they are more than happy to share their experiences of TPG and PSLink with companies considering integrating Microsoft Project and SAP PS or PM. Please contact us if you wish to find out more about our customers.


Targeted information for planners and managers

TPG PSLink is extensively configurable, enabling it to support clearly defined use cases in project management and accountancy. SAP is primarily used as the backend for financial controlling, while the project planning is conducted in Microsoft Project. This makes TPG PSLink very flexible for use in various business scenarios including those where SAP PS is not implemented. 


The features of the TPG PSLink SAP integration product

  • Very rapid implementation due to extensive configuration options
  • Middleware with Web client and Microsoft Project add-in
  • Comprehensive verification mechanisms for maximum reliability
  • Full integration with the Microsoft Project Server security system
  • Synchronization can be manual or automated with its own job queue administration
  • The integration supports as many SAP systems, SAP clients and Microsoft Project Server sites as required
  • Multi-lingual interface
  • Proven integration solution over many years with multiple customer references

TPG PSLink SAP integration product works with these versions   

  • Microsoft Project Server 2003   
  • Microsoft Project Server 2007   
  • Microsoft Project Server 2010   
  • Microsoft SharePoint 2007   
  • Microsoft SharePoint 2010   
  • SAP/R3 4.6c and higher, ECC 6.0

Integration customer testimonials about TPG PSLink

Such is TPG’s relationship with our clients that they are more than happy to share their experiences of TPG and PSLink with companies considering integrating Microsoft Project and SAP PS or PM. Please contact us if you wish to hear more of our customers. Or read some customer statements first.


Initial population and continuos update of the resource pool

TPG ResourceLink enables you to not only perform the initial population of the Microsoft Project Server Enterprise Resource Pool, but also to continually update it.

SAP Cert Logo

Some firms run by TPG PSLink

AOL, USA
BAE Systems, GB
Bentley Systems, USA
Cassidian Defence Electron. GER
Cassidian Military Air Syst. GER
City of Braunschweig, GER
DESY, GER
Dimension Data, ZA
EADS, GER
E.ON, GER
Felsomat, GER
Frequentis, AUS
GoodYear, USA
Harman International, USA
Hydro Quebec, CA
Irish Rail, IRL
Kayser-Threde, GER
Kemira, FI
Keiper Recaro, GER
Lonza, UK
MAN Diesel & Turbo, GER
Ministry of Finance, TH
MT Aerospace, GER
Nordex Wind Turbines, GER
Rentschler Biotechnologie, GER
SGL Carbon, GER
Siemens Energy, GER
Siemens Mobility, USA
Tata Steel, UK
TDW, GER
Tecnisa, BRA
Tyco Electronics, USA
Vaillant Group, GER
Varian Medical Systems, USA
etc.

More Customers