Case Studies for Project Management Solutions at Well-Known Companies

TPG The Project Group has been an internationally active company of project management experts for over 20 years. We offer consulting and solutions for your enterprise-wide project management to customers from a wide range of industries. Our focus are Microsoft technologies and their integration with ERP, Workmanagement, CRM and any other systems.

See TPG Case Studies

 

We have advised and developed suitable IT solutions for the following industries and international companies (excerpt from customer list):


Aerospace and Defense

  • Airbus (DE, FR, FI)
  • BAE Systems (UK)
  • Eurofighter (DE, UK)
  • General Dynamics (UK)
  • Hampson Group (UK)
  • Hensoldt (DE)
  • Jet Propulsion Laboratory (US)
  • Meggitt (UK, USA, CH)
  • MT Aerospace (DE)
  • QinetiQ (UK)
  • Raytheon (UK)
  • Rheinmetall (CH, DE, AT)
  • Sonardyne (UK)
  • TDW (DE)

Automotive

  • Continental (DE)
  • Daimler TSS (DE)
  • Dürr (DE)
  • Edscha (DE)
  • Harman International (DE)
  • Knorr Bremse (DE)
  • Lisa Dräxlmaier (DE)
  • Ronal Group (CH)
  • Rosenbauer (AT)
  • Valeo (FR)
  • Volkswagen (DE)

Engineering and Construction

  • ABB (CH, DE)
  • Bär Bahnsicherung (CH)
  • Deutsches Elektronen Syn. (DE)
  • Implenia (CH)
  • JCB (UK)
  • Liebherr (DE, FR, AT, CH)
  • Lürrsen Werft (DE)
  • MAN Diesel & Turbo (DE)
  • MRV Engenharia e Particip. (BR)
  • NG Bailey (UK)
  • Nordex (DE)
  • Paul Scherrer Institut (CH)
  • Sauter (CH)
  • Schindler Aufzüge (CH)
  • SGS (CH)
  • Siemens (DE, CH)
  • Steiner (CH)
  • Thyssen-Krupp Marine Serv. (DE)
  • voestalpine group-IT (AT)
  • vonRoll (CH)

Life Sciences and Chemicals

  • ACHÉ Labor. Farmacêuticos (BR)
  • Aspen Global (MP)
  • Boehringer Ingelheim (DE, AT)
  • BTG (UK)
  • Clariant (CH)
  • DSM Nutritional Products (CH)
  • Fresenius (DE)
  • Kemira (FI)
  • Linde (DE)
  • Lonza (UK)
  • Novimmune (CH)
  • Novartis (CH)
  • Novo Nordisk (DK)
  • Rentschler Biotechnologie (DE)
  • Roche (CH)
  • SABIC (SA)
  • Tasnee (SA)
  • Weleda (CH)

Telecommunications and IT

  • Abaco Systems (US, UK)
  • Accarda (CH)
  • Avectris (CH)
  • BCX (ZA)
  • Botswana Telecom (BC)
  • British Telecom (UK)
  • Derivco (ZA)
  • Die Post (CH)
  • Dimension Data (ZA)
  • ELM Information Securities (SA)
  • ETC (ZA)
  • IT des Bezirks Oberbayern (DE)
  • Microsoft (CH)
  • Netcall (UK)
  • Orange (UK)
  • Oreedoo (QA)
  • STC (SA)
  • Swisscom (CH)
  • TRAX Systems (US)
  • Xaar (UK)

Industrial Machinery and Components

  • ABB (CH, DE)
  • Argo-Hytos (CH)
  • BILSTEIN Service (DE)
  • Bosch (BSH) Hausgeräte (DE)
  • Braunschw. Masch.bauanst. (DE)
  • Bystronic (CH)
  • Comer Industries (IT)
  • Karl Storz (DE, US)
  • Leopold Kostal (DE)
  • Messer Cutting Systems (DE)
  • Nobilia (DE)
  • Oerlikon (CH)
  • Otto Bock Healthcare (DE)
  • Schunk (DE)
  • TURCK Electronics (DE)
  • Vaillant (DE)
  • Viessmann (DE)
  • Vorwerk (DE)

Health Care

  • Fisher Clinical Services (CH)
  • MED-EL (AT)
  • Sport Mental Academy (CH)
  • Synlab (DE)
  • Ultravision (UK)
  • Universitätsspital Zürch (CH)

Financial Services

  • Astute (NA)
  • Baloise Group / Basler Vers. (CH)
  • Capricorn Investment Hold. (NA)
  • Credit Suisse (CH)
  • First National Bank (ZA)
  • G Research (UK)
  • KfW Bankengruppe (DE)
  • KPMG (CH)
  • KV Niedersachsen (DE)
  • Miller Insurance (UK)
  • Münchener Verein (DE)
  • Willis Towers Watson (DE)
  • WorldPay (UK)

Utilities, Energy, Oil and Gas

  • AIL (CH)
  • Axpo (CH)
  • BKW (CH)
  • Companhia Paulista De Força E Luz (BR)
  • Energie 360 (CH)
  • Grupo Votorantim (BR)
  • IWB (CH)
  • Nigerian National Petroleum (NI)
  • Qatargas (QA)
  • Saudi Aramco (SA)
  • Swissgrid (CH)
  • Uniper (DE)
  • Vestas (DK)

Public Sector

  • AIMS (AU)
  • Berner Fachhochschule (CH)
  • Bischöfliches Ordinariat (DE)
  • Bundesbeschaffungsges. (AT)
  • European Patent Office (DE)
  • Kanton Basel-Stadt (CH)
  • Limpopo Provincial Gov. (ZA)
  • London Business School (UK)
  • Max-Planck Institut (DE)
  • NATS (UK)
  • SKJV (CH)
  • St Marys Univesity (UK)
  • Stadt Zürich (CH)
  • Sunshine Coast (AU)
  • University of Westminster (UK)
  • Western Cape Government (ZA)

Retail and Consumer Goods

  • Clover (ZA)
  • Coop / Bell (CH)
  • Dr. Oetker (DE)
  • Emmi (CH)
  • Grupo Leao (BR)
  • Masscash (ZA)
  • Massdiscounters (ZA)
  • Migros (CH)
  • Mr. Price (ZA)
  • Pentland (UK)
  • Sonepar (DE)

Travel and Transportation

  • Essener Versorgungs- & Verkehrsges. (DE)
  • Hamburg Port Authority (DE)
  • Helsinki City Transport (FI)
  • Irish Rail (EI)
  • Streck Transporte (CH)
  • Transnet (ZA)    

Other Industries

  • EWERK RZ (DE)
  • Mediaprint (AT)
  • Plansee (AT)
  • Rodenstock (DE)
  • Stora Enso (FI, SE, CN)
  • Straumann (CH)
  • Swiss Prime Site (CH)

Case Studies for TPG Project Management Solutions

Industry
- Warehouse and Logistics Systems

Department
- Project Management

Solution Components
- MS Project Online
- TPG QuickStart
  (Pre-packaged solution)

> Read Case Study

 

Industry
- Industrial gases
- Engineering

Department
- Investment Projects

Solution Components
- MS Project Online

> Read Case Study

 

Industry
- Automotive

Department
- Building
- Construction
- Engineering

Solution Components
- MS Project Server
- MS SharePoint Server
- TPG PSLink
  (SAP Integration)

> Read Case Study

 

Industry
- Construction
- Engineering

Department
- Product Development
- Engineering Services

Solution Components
- MS Project Server
- MS SharePoint Server
- TPG QuickStart
  (Pre-packaged solution)

> Read Case Study

Industry
- Engineering
- Construction
- Manufacturing

Department
- Components

Solution Components
- Microsoft Project Server
- Microsoft SharePoint
- TPG ProjectLink
  (Multi-Project Mgt.)

> Read Case Study

Industry
- Energy

Department
- Project Delivery

Solution Components
- MS Project Server
- TPG PSLink
  (SAP Integration)
- TPG ResourceLink
- TPG TeamManager
  (Resource Planning)

> Read Case Study

Industry
- Food

Departments
- IT
- Marketing / HR
- Production Planning
- Product Development

Solution Components
- MS Project Server
- Microsoft SharePoint
- Custom Reports

> Read Case Study

Industry
- Automotive
- Electronics

Department
- Engineering

Solution Components
- Microsoft Project Server
- Microsoft SharePoint
- TPG PSLink
  (SAP Integration)
- TPG ResourceLink

> Read Case Study

Industry
- Automotive

Department
- Precision Engineering

Solution Components
- MS Project Server
- MS SharePoint Server
- TPG PSLink
  (SAP Integration)
- TPG ProjectLink
  (Multi-Project Mgt.)

> Read Case Study

Industry
- Heating / AC / Ventilation

Department
- R&D

Solution Components
- MS Project Server
- MS SharePoint Server
- TPG PSLink
  (Integration SAP)
- TPG ProjectLink
  (Multi-Project Mgt.)

> Read Case Study

Industry
- Medical Engineering

Department
- Product Development

Solution Components
- MS Project Server
- MS SharePoint Server
- TPG PSLink
  (Integration SAP)
- TPG ResourceLink
- Many Custom Reports

> Read Case Study

Industry
- Aerospace
- Defence
- Energy

Department
- Engineering

Solution Components
- Project Online
- Microsoft Power BI
- TPG PSLink
  (SAP Integration)

> Read Case Study

Industry
- Travel & Transportation

Department
- Infrastucture

Solution Components
- Office 365
- Power BI
- Project Online
- SharePoint Online

> Read Case Study