5-Day Intensive Training for the PMP® or CAPM® Exams

A solid foundation of basic methods and process knowledge are indispensable for a good project manager. With the globally recognized certification as Project Management Professional / PMP®, you will demonstrate that you have truly mastered the necessary knowledge. That is an important advantage for your market value, particularly in uncertain times.

That is why for many years we have been offering a 5-day intensive training course in PMP exam preparation, concentrated in one week and held by very experienced trainers. The course is also a good preparation for the CAPM® Exam.

We only offer this as a company seminar in English. Click below for the dates and details of this training in German.

Seminar in German

Small Group Size and PDUs

The small group size with a maximum of nine participants ensures effective learning and allows plenty of time for you to ask questions. As an PMI® Registered Education Provider (R.E.P.) we offer you 14 or 21 PDUs (2 or 3 days – details see below) for this seminar.

Clear Preparation for the PMP Certificate

This seminar specifically prepares you for the exam for PMP certification. In the 5-day intensive course, you will learn about all the aspects of the project management processes as well as the knowledge areas from the PMBOK® Guide (Project Management Body of Knowledge, 6th Edition). Special attention is devoted to the areas that are relevant to the exam but are not included in the PMBOK® Guide. This will leave you very well prepared for the exam.

Special Benefit: Detailed PMP Exam Resource Pack

Seminar participants receive a carefully prepared PMP Certification Resource Pack. It contains well over 500 pages of software, templates, and numerous hyperlinks for further exploration of seminar materials and for use in your own projects.

Many typical exam questions, interactive discussions, and engaging examples ensure a steady focus on the exam throughout as well as relevance to your day-to-day work.

Our trainer Oliver F. Lehmann, PMP, is highly experienced and has been working for TPG for several years.

Important: The course fully satisfies the 35 contact hours required by the PMI® for the exam.

Über 98 % der Teilnehmer haben die PMP Prüfung im ersten Anlauf bestanden. Die freundliche Betreuung und die lockere Atmosphäre beim Training werden von den Teilnehmern immer wieder positiv erwähnt.

PMP SEMINAR – INHALTE

Tag 1

  • Grundlagen zum PMI, PMP und PMBOK® Guide
  • Anmelde- und Prüfungsprozess
  • Projektlebenszyklen
  • Stakeholders
  • PMBOK®Guide Prozessmodell
  • Multiprojektmanagement

Tag 2

  • Initiierungsprozesse:
    • Projektauswahl
    • High-Level-Risikomanagement
    • Organisationsstruktur
    • Project Charter
  • Planungsprozesse:
    • Scope-Planung
    • Stakeholder-Management
    • WBS

Tag 3

  • Planungsprozesse (Forts.)
    • Netzplanung
    • Terminplanung
    • Schätzen
    • Kostenplanung
    • Risikomanagement
    • Änderungswesen und Konfigurationsmanagement
    • Kick-off Meeting

Tag 4

  • Ausführungsprozesse:
    • gemeinsames Verständnis herstellen
    • Einkaufsmanagement und Vertragswesen
    • Qualitätsplanung und -sicherung
    • Kommunikation
    • Organisationstheorie und Motivation

Tag 5

  • Überwachungs- und Steuerungsprozesse:
    • Data date
    • Baselines und Soll- / Ist-Vergleiche
    • Earned Value Analyse und Management
    • Qualitätslenkung
  • Abschlussprozesse:
    • Übergabe
    • Vertragsabschluss
    • Lessons learned
    • Projektarchivierung

What You Need to Know

Target group: Project Managers whose goal is the PMP or CAPM certificate

Prerequisites: There are no prerequisites for the seminar.

Duration: 5 days

Interested in this Seminar?
In English language, we offer this seminar only as an individual company seminar. If you are interested, please use the contact button or call us at +49 89 615593-30.

In German language, we regularly offer this seminar in Munich. Please > find out more here.


Termine und Buchung dieses Seminars

Seminar / Schulung

PMP Seminar / Schulung: Kompakte PMP-Prüfungsvorbereitung

PMBOK® Guide 6th Edition
Trainer: Oliver F. Lehmann, PMP

5 Tage, in München

€ 2.350,- netto (€ 2.796,50 brutto)

* Dieser Termin findet auf jeden Fall statt, noch Plätze frei.

Termine

26.-30.08.2019 *

14.-18.10.2019

02.-06.12.2019


Ideal Preparation also for the CAPM® Exam

This PMP seminar is also excellent preparation for the Certified Associate in Project Management (CAPM®) exam. The CAPM certificate is the verification of knowledge of PMI methods for young professionals who still lack the required experience as a project manager (3 or 5 years) for the PMP exam admission.

High Level of Practical Relevance

TPG The Project Group is one of the top names globally when it comes to Microsoft Project. We have over 20 years of experience in the project management consulting and Microsoft Project training field.

Our trainers are certified experts and have extensive experience working with customers in all industries.

For you as a participant, this ensures course content with a high level of practical relevance and up-to-date real-world examples.


TEILNEHMER-FEEDBACKS

Sehr gutes Seminar! Kleine Lerngruppe mit vielen neuen und für das Projektumfeld wichtigen Erkenntnissen.

Im Seminar erlangt man ein vertieftes Methodenwissen. Ich fühle mich auf die Prüfung gut vorbereitet.

Sehr gut vorbereitetes und kurzweiliges Seminar. Viele hilfreiche Infos und Tipps für die PMP-Prüfung. Sehr zu empfehlen!

Viele wertvolle Tipps für die Prüfung wurden vermittelt.

Der Trainer war sehr gut und es hat Spaß gemacht zuzuhören.

Alles war sehr gut, danke!

Freue mich, dass ich dieses Seminar gewählt habe. Sehr interessant präsentiert und mit vielen interessanten Beispielen geschmückt.

Das Seminar ist sehr umfrangreich und deckt das ganze Spektum für den PMP ab. Der Aufwand lohnt sich aber in jedem Fall um zu wissen, wie man die nächsten Schritte angeht und diese dann (hoffentlich) zum Ziel führen.

Das Seminar hat mir sehr gut gefallen. 5 Sterne.

Sehr gutes Seminar

Sehr praxisnah. Die Kapitel im PMBOK sehr verständlich durchgearbeitet. Sehr hilfreiches Seminar!

Da das Ziel das Ablegen einer Prüfung ist, ist die finale Bewertung schwierig. War aber ein sehr gutes Seminar!

Klasse! Es ist noch was zu tun, aber wirklich empfehlenswert für die Prüfungsvorbereitung.

Gut fand ich, dass Beispiele gemeinsam online bearbeitet wurden und dass ein großes Ressourcen-Pack zur Verfügung gestellt wurde.

Straffer Kurs mit sehr guter Zeitplanung. Umfassender und interessanter Inhalt als gute Vorbereitung zur Prüfung.

Das PMP Seminar und das von Herrn Lehmann verteilte Lernmaterial haben mir sehr viel geholfen. Beide haben den prüfungsrelevanten Teil des PMBOK gut zusammengefasst. Nützlich waren die Rechnungsbeispiele (z.B. EMV) und die Vorstellung der wichtigsten Tools und Techniken.

Faszinierend, wie theoretisches Wissen kompakt, witzig und bildhaft in dieser Masse und in Time vermittelt werden kann.

Das Seminar war eine perfekte Vorbereitung auf die PMP Prüfung. Obwohl ich schon umfangreiche PMBoK Vorkenntnisse und langjährige Projekterfahrung hatte, hat sich die Teilnahme an diesem Seminar für mich absolut gelohnt. Das praxisnahe Auffrischen der formalen PMI-Theorie und die gute Vorbereitung mit Hilfe von Testfragen hat wesentlich dazu beigetragen, dass ich bereits kurz nach dem Seminar meine PMP-Prüfung bestehen konnte.

Ich bin mir sicher, dass ich das hervorragend aufbereitete und dargebrachte Wissen aus dem Seminar sehr gut in die Tat umsetzen kann und bin zuversichtlich auch die Prüfung positiv abzuschließen.

Herzlichen Dank für das interessante Seminar. Ich denke, das hat wirklich was gebracht auf dem Weg zum PMP. Aber auch Danke an Sie persönlich und an TPG für all das Drumherum. Ich empfand alles als sehr gut organisiert und professionell.

----------------
“PMI”, “PMP”, “CAPM”, “PMBOK”, "PMI-ACP", and the Registered Education Provider Logo are registered marks of Project Management Institute, Inc.