Primavera Integration w. Microsoft Project / Online

TPG PSLink: An Oracle Primavera Integration Product

TPG PSLink® Primavera is a product that enables data exchange between Microsoft Project Server / Project Online, SharePoint and Oracle Primavera. 

The Benefits of Integrating Microsoft Project with Primavera: 

Simplify multiple project tasks with streamlined, end-to-end project management processes

Transfer information stored in Primavera or Microsoft Project including WBS structures and Activities

Eliminate dual data entry, free up resource administrative time

Improve data quality with automatic sync feature and verification mechanism

Choose when data is synched between the systems

Extensive Configuration Options and Testing Mechanisms

TPG PSLink® ensures the consistency of data being shared across the systems involved.

Sync Information from Oracle Primavera Including:

Oracle PrimaveraData Integration Capability
WBS Structures- Create, Read, Update, Delete
- All Fields
Activities - Create, Read, Update, Delete
- All Fields

Compatibility: Microsoft Project – Oracle Primavera Integration 

  • Microsoft Project Server 2016
  • Microsoft Project Server 2013 
  • Microsoft Project Online
  • Microsoft Project Server 2010   
  • Microsoft SharePoint 2016
  • Microsoft SharePoint 2013
  • Microsoft SharePoint Online
  • Microsoft SharePoint 2010
  • Oracle Primavera