The Successor to Project Online – Built on the Power Platform and Microsoft 365

Unclear about your resource utilisation? Tired of constantly chasing down information and juggling Excel or Smartsheets? Then it's time to discover TPG ProjectPowerPack and regain full control over your projects and resources.

TPG’s next-generation project management software delivers integrated project and portfolio management (PPM) - within your Microsoft 365 environment.

With over 27 years of project management expertise built into its modular design, TPG ProjectPowerPack includes best-practice approaches. Your PMO, project managers, and other stakeholders will benefit from a streamlined project and portfolio management experience in the Microsoft Cloud.

Note: Microsoft is no longer developing Project Online and recommends upgrading to the Power Platform as soon as possible. That’s why TPG ProjectPowerPack is the modern successor to Project Online.

Your Central Flexible Source of Project Information

TPG ProjectPowerPack consolidates your project, portfolio, resource, and task information into a single, accessible view within Microsoft 365. This ensures that your stakeholders – from project managers to executives – have access to up to date, accurate and consistent data, facilitating informed decision-making and streamlined project execution.

At the heart of this next-generation PPM app is a collection of proven best-practice approaches supporting project, portfolio, resource, and task management. These can be combined with your preferred scheduling tool – including Microsoft Planner Premium (formerly Project for the Web), TPG Scheduler, Microsoft Project with Project Online, Jira, Azure DevOps, Primavera P6 and more.

Your Benefits

Here’s what you gain from using our PPM Product in the Microsoft Cloud:

  • Boost Efficiency: Streamline collaboration with Microsoft Teams integration
  • Stay Informed: Access all your project data from one centralised source
  • Decide Faster: One-click reports for quick, data-driven decisions
  • Work Consistently: Apply best practices for reliable and repeatable results
  • Plan Smarter: Build on a strong foundation with AI-powered insights

TPG ProjectPowerPack works with Microsoft Planner Premium (formerly Project for the Web), Project Online with Project Desktop and or TPG Scheduler to meet your scheduling needs.

Request tool demo now

A Future-Proof Solution to Your Challenges

Your Challenges  The TPG ProjectPowerPack Advantage
Multiple apps disrupt your workflow. Your PPM app: Your project data in a central location with an app that enables you to work across your portfolios, programs and projects. Work with embedded best-practice approaches, including workflows, document storage, time tracking, and more! Fully integrated and expandable as you change.
No central data source with historical tracking leads to inconsistencies and sub-optimal decision-making. Centralised project data: All your project data resides centrally in your Microsoft 365 environment – enabling you to have visibility across your portfolio to make informed decisions. Snapshots provide historic insights and trend analysis with Microsoft Copilot.
Lack of transparency and time-consuming, error-prone manual reporting makes oversight challenging. Your PPM reporting app: 40+ reports covering project status, resource utilisation, and portfolio performance enables KPI-based management – with options to incorporate data from other line of business systems.
Complicated apps and poor user experience stifle adoption. Intuitive usability: A modern user experience, including Microsoft Teams integration, supports user adoption and reduces onboarding effort.
Out-of-date and poor-quality data due to lack of integration Multi-directional integration (ETL): Connectivity across your line of business apps including SAP, Jira, Azure DevOps, Primavera P6, Microsoft Planner. TPG Scheduler and other apps provides an “always-current” data foundation.
Rigid tools with no flexibility prevent scaling with changes in your PPM environment. Flexible for future growth: Built on the Microsoft Power Platform means you can configure and implement custom capabilities enabling you to be future ready when new capabilities appear.
Lack of transparency of cross-project dependencies leads to conflicts. Cross-project visibility: In multi-project and program management, dependencies between tasks and projects are visible in schedules, supporting proactive change communication.
Task planning and delegation between project leads and team members causes friction. Task-Activity Linking: Foster collaboration in planning and tracking by directly linking Kanban board tasks to Gantt chart activities.
Lack of cross-project resource visibility leads to over- or underutilisation of staff. Central resource pool: Understand who is working on what, when, across your portfolio and make informed decisions about resource management.
Exporting data from your current toolset. Future-proof data availability: Your data is stored securely in Dataverse in your Microsoft 365 environment. Meaning the data is yours to use and extract.

 

TPG ProjectPowerPack Overview
 

Request tool demo now

TPG ProjectPowerPack QuickStart Package

Get a Head Start with Your Project & Portfolio Management! The QuickStart Package for TPG ProjectPowerPack delivers a pre-defined configuration based on best-practice project management methods. It comes with a wealth of templates and includes training. Your benefits: Quick implementation in days / weeks + Affordable fixed price + Flexible and scalable to meet your future needs.
> Learn more about TPG QuickStart

Microsoft PPM Software: Start Fast – Scale As You Grow

TPG QuickStart offers a fixed price, packaged, cost-effective, and rapid introduction to TPG ProjectPowerPack. This approach includes a workshop, installation, configuration, and training sessions. This delivers a pre-configured solution featuring best practices for project, portfolio, resource, and task management within your Microsoft 365 environment.

The modular, configurable and customisable PPM app can change over time to match your evolving needs and the maturity of your organisation. This supports long-term user adoption and protects your investment.

TPG ProjectPowerPack is deployed in your Microsoft 365 tenant as a package and is quickly available after an initial configuration, which typically includes updates to:

  • Project types and associated methodologies
  • Categories for risks, open issues, decisions, and change requests
  • Selection lists for project status
  • Organisational structure
  • Currencies
  • Corporate colours and logo

The Only Microsoft PPM Tool you Need for the Future

Built on the flexible Microsoft Power Platform, TPG ProjectPowerPack grows with your business. Thanks to its low-code / no-code foundation, you can extend the solution at any time – through configuration and customisation. Your data remains securely stored within your Microsoft 365 environment – always accessible, exportable, and ready to support AI applications.

That’s just one of the reasons that makes TPG ProjectPowerPack a future-proof solution for your project management needs. It also integrates with Microsoft Teams – aiding collaboration across your organisation. Therefore it is the only PPM tool you'll need going forward.

Enhanced Functionality to Simplify your Daily Work

TPG ProjectPowerPack has been developed on the Microsoft Power Platform and is delivered through Power Apps, Power Automate, and Power BI. The PPM software integrates Microsoft Planner (formerly Project for the web), Project Online or TPG Scheduler for project planning and provides the following extended capabilities:

  • Portfolio and program management
  • Project types, master data, and lifecycle management
  • Project requests with approval workflows
  • Strategic drivers for prioritisation
  • Project goals and benefits for the project charter
  • Project attributes and status indicators
  • Budgeting and cost planning at the project level
  • Document management in SharePoint / Teams
  • Risk, issue, and change request tracking
  • Task planning via boards
  • Time tracking for team members
  • Project history and status reporting
  • Reporting package with over 40 reports
  • Role- and function-based permissions

For larger, complex projects and cross-project dependencies, TPG Scheduler offers an alternative planning interface – further extending the capabilities of TPG ProjectPowerPack.

CUSTOMER FEEDBACK

“By combining various project management solutions within the Microsoft Power Platform, we were able to implement a state-of-the-art project and portfolio management solution using TPG ProjectPowerPack. It is integrated into all backend systems through a single user interface and serves as a single point of truth.” 

Andreas Stumpp, Associated Partner, Project Unit, MHP Management and IT-Consulting (a Porsche Company)

Request tool demo now

Implementing this Microsoft 365 Project Management Software

Option 1 – TPG QuickStart: This approach provides the fastest way to get TPG ProjectPowerPack up and running. The app is deployed in your Microsoft 365 tenant and a base configuration with a defined scope is delivered. The configuration can be expanded later as needed.

Option 2 – Customised approach: The outcome of solution design workshops are implemented step by step. This may include new fields and tables, reports, workflows, views, and integration with other systems. We combine our best practices with your specific requirements to create a PPM tool that fits your organisation perfectly.

Onboarding for Maximum User Adoption: With both implementation approaches, we support you from the beginning with structured onboarding to ensure strong user adoption. A successful rollout requires more than just technical deployment—the system must be introduced holistically. All stakeholders need to be informed and engaged in a timely manner. In addition to tool-specific training, processes and methodologies must also be established to elevate your project management maturity. We offer support ranging from simple User Adoption measures to comprehensive consulting and change management services.
 

What Licenses do you Need to Deploy TPG ProjectPowerPack

Different user roles— project managers, team members, and others—require specific licenses from both TPG and Microsoft. Contact us to clarify the details.

Per user

  • TPG ProjectPowerPack – Full or Team Members
  • Power Apps– Per App SKU or Premium SKU
  • Power BI Pro – included in Microsoft 365 E5

Per instance (installation)

  • 1* Power Automate Premium

Your organisation may already have the appropriate Microsoft 365 and Power Platform licenses in place. If needed, we’re happy to assist you with license provisioning through our Microsoft Cloud Solution Provide (CSP) offering.

Some Customers* using TPG ProjectPowerPack

Automotive
- Alois Kober (DE)
- Intercable (IT)

Engineering & Construction
- Marti (CH)
- thyssenkrupp Uhde (DE)

Consulting, IT & Telecom.
- CTE (CH)
- EY Global Services (UK)
- NTT Data (ZA)
- MHP Mgt.- & IT-Beratung (DE)
- Ticos Engineering (CH)

Finance
- South African Reserve Bank (ZA)
- Kaiser & Partner Privatbank (CH)
- Toyota Financial Services (DE)
- Carmignac (FR)

Health Care
- DSM (CH)
- Kantonsspital Aarau (CH)
- Schweizer Paraplegiker Zentrum (CH)
- Swiss Trop. & Pub. Health Inst. (CH)

Retail & Consumer Goods
- Bell Group (CH)
- CITTI Handelsgesellschaft (DE)
- Einkaufsbüro Dt. Eisenhändler (DE)
- Euronics (DE)
- Kerry Group (IE)
- Läderach (CH)
- Migros (CH)
- REWE Group (DE)
- Rotkäppchen-Mumm (DE)

Life-Sciences & Chemicals
- Celonic (CH)
- Paul Schärrer Institut (CH)

Mechanical Engineering
- Greencells (DE)
- IBC SOLAR (DE)
- Vaillant Group (DE)
- Weig Holding (DE)

Public Sector
- Akademie Bay. Genossensch. (DE)
- Genossenschaftsverb. Bayern (DE)
- IHK zu Kiel (DE)
- Messe München (DE)
- Tiefbauamt Zürich (CH)

Travel, Transport & Logistics
- Die Zentralbahn (CH)
- FTI Touristik (DE)
- NATS Holding (UK)
- Streck Transport (CH)

Supply & Energy
- Aziende Industriali di Lugano (CH)
- energie360° (CH)
- Open Grid Europe (DE)
- Primeo Energie (CH)

Others
- Berner Fachhochschule (CH)
- Careum (CH)
- Tama Group (IS)

* In addition, there are other customers who may not be listed here, e.g. from Austria and other countries.

Your free personal online consultation

Would you like a free personal online consultation with a TPG expert to find out how you can take your multi-project / program management to the next level? Together we will talk about your questions, requirements and possible next steps – no costs for you!

Please click on the "Contact us now" button below and the contact form will open. Submit the form and we will get back to you as soon as possible with a proposed date for your free online consultation.

Contact us now

FAQ: Questions and Answers about TPG ProjectPowerPack

1. Who needs TPG ProjectPowerPack?

The app is ideal for any organisation aiming to maximise their ability to deliver projects successfully. If you're seeking to move away from spreadsheets and disconnected systems, TPG ProjectPowerPack offers a unified, streamlined solution. With its user-friendly interface, modern design, and flexible configuration and customisation options, it delivers a smooth and targeted entry into professional project and portfolio management. It also provides fast implementation and immediate access to key insights across your project landscape—such as a centralised project list, resource utilisation, and a comprehensive reporting package.

2. Why upgrade from Project Online to TPG ProjectPowerPack?

Project Online is based on SharePoint Online, and Microsoft has announced that SharePoint workflows will be retired in April 2026. After that, workflows can only be created using Power Automate. So why not start thinking now about a gradual migration? Many of the modern features available in TPG ProjectPowerPack—such as Kanban boards, task management, and stakeholder tracking—are difficult and costly to implement in SharePoint. With the Power Platform, these capabilities are easy to set up and are already included as standard in TPG ProjectPowerPack.

3. Is there a demo version of TPG ProjectPowerPack available for testing?

Yes, we offer a free, guided trial environment. You’ll have the opportunity to test the solution yourself, with one of our experts available alongside you as a coach to answer any questions in real time. The session typically lasts around four hours, giving you a solid understanding of the solution and immediate answers to your key questions. If you're interested, please use the contact form on our website.

4. Can I plan my resources with TPG ProjectPowerPack?

Yes, TPG ProjectPowerPack enables resource planning in various ways. You can manage individual team members, skills, or generic resources. In addition, financial data—such as budgets, planned values, and actuals—can be planned and tracked at the project level.

5. Where is my data stored?

TPG ProjectPowerPack is built on the Microsoft Power Platform and stores all data in Dataverse—within your own Microsoft 365 environment.

6. How quickly can TPG ProjectPowerPack be deployed?

Assuming your organisation already has a Microsoft 365 environment in place and the relevant IT contacts are available, technical deployment can typically be completed in a single day. The duration of further configuration depends on the scope. With TPG QuickStart for ProjectPowerPack, a preconfigured setup is available to accelerate implementation.

7. How much training is required for TPG ProjectPowerPack?

Training requirements vary by user role. For the standard configuration, training for project managers usually takes 1/2 day per group. Team members typically receive either a video tutorial or a handout covering the key features. If the solution is customised, training content can be adapted accordingly.

LICENSING

8. Where can I get pricing information for TPG ProjectPowerPack licenses?

Please contact our sales team via the contact form on our website, and we’ll be happy to provide detailed pricing information.

Data Exchange / Integration

9. Can TPG ProjectPowerPack be integrated with other systems like SAP or Jira?

Yes, TPG ProjectPowerPack can be integrated with various systems—including SAP, Jira, and DevOps—using our proven TPG PSLink integration middleware.

10. Can I integrate TPG ProjectPowerPack with Microsoft Teams?

Yes, TPG ProjectPowerPack is integrated with Microsoft Teams by default. A dedicated team or channel can be created for each project, with project documents managed directly in Teams. Additional project information, such as project status or schedules, can also be displayed within Teams. A separately licensed TPG ProjectPowerPack Team Member app for Microsoft Teams offers an overview of all upcoming tasks for team members and the project portfolio.

11. What data can I import from existing systems?  (Excel, Microsoft Project)

Since TPG ProjectPowerPack is built on the Power Platform, nearly all project-related data—such as projects, portfolios, programs, and resources—can be copied or imported manually from Excel. Lists can typically be imported directly, and MPP files (Microsoft Project) can also be imported.

12. Can I use resource data from Active Directory?

Partially. Active Directory (AD) and Azure Active Directory (AAD) typically don’t include all the data required for a complete resource pool. However, basic data—such as start and end dates or employment levels—can be retrieved from AD, AAD, or other HR applications using our TPG PSLink integration solution.

13. Can Microsoft Outlook calendars be considered in resource planning?

Yes, this is possible through a custom solution. You’ll need to define which data from Outlook calendars—often maintained very differently by each employee—can be structured and transferred into the TPG ProjectPowerPack base calendar. For example, importing approved vacation days makes sense, so availability for project work is accurately reflected.

14. Can an external time tracking system be integrated?

Depending on the available interfaces of your time tracking system, data exchange can be implemented—either one-way or bidirectionally—as part of a custom solution. It’s also important to define how updates with actual hours will affect related planning and calculations.

CONFIGURATION & Customization

15. Can TPG ProjectPowerPack be configured to match our corporate design?

Yes, during deployment, your company’s colours and logo are incorporated into TPG ProjectPowerPack to reflect your corporate branding.

16. Can TPG ProjectPowerPack be individually extended? Can we do it ourselves?

Yes, Power Platform' offers extensive options for configuration, customisation and extension. You can tailor the data model, forms, and process steps to your needs. We’ve implemented client specific process solutions for many clients – including idea management or project request workflows. With training and knowledge building, you can perform these changes independently while ensuring compatibility with future updates.

17. Can I roll out TPG ProjectPowerPack internationally (currencies, languages)?

Yes, TPG ProjectPowerPack supports easy configuration of currencies. The current version includes support for German, English, French, and Arabic. Each user can choose their preferred language, and additional languages can be added using customer-provided translations.

18. Can I adapt TPG ProjectPowerPack to my project management processes? (Permissions, fields)

Yes, TPG ProjectPowerPack uses Microsoft Dynamics for its permissions model, allowing you to define and extend teams and security roles. You can also expand the data model, forms, and approval processes with minimal effort.

19. Can I use my own project templates?

Yes, any existing project in the system can be saved as a template. You can also assign different feature sets to different templates—for example, some projects might require comprehensive risk management, while others only need a simple issue tracker.

20. What reports are available in TPG ProjectPowerPack (Portfolio View, PMO View, etc.)?

TPG ProjectPowerPack comes with a comprehensive reporting package based on Power BI. It includes over 40 reports covering portfolio, project, resource management, and project requests.

21. Can I implement idea management with TPG ProjectPowerPack?

Yes, the standard version of TPG ProjectPowerPack includes project request functionality with configurable forms and approval workflows. Dedicated idea management or pre-project phases can be added through custom extensions. Note: idea submissions can involve users who do not yet have licenses for TPG ProjectPowerPack or the Power Platform.

22. Is there a user access system to control visibility of resource usage in projects?

Yes, for example, project managers can only see the overall workload of team members outside their own projects, not what those team members are working on. This helps assess availability without exposing unnecessary details. Users with portfolio-level access can view detailed project data to help resolve resource conflicts.

23. Is it possible to restrict project visibility to authorised users only?

Yes, each project manager can grant read or write access to specific users for their project. Access permissions are managed through the overarching role-based model.

Other Questions

24. What does the future development of TPG ProjectPowerPack look like?

TPG has actively developed TPG ProjectPowerPack since 2020 and releases a new version approximately every three months.

25. Is there a way to record line activities separately (e.g., vacation and absences) so that pure project availability is visible?

Yes, team leads can create separate projects dedicated solely to recording absences and non-project (line) activities. For comprehensive resource planning – including requests and approvals at the project level – TPG CoReSuite can also be used as a complementary solution.

26. Does the schedule differentiate between effort and duration?

Yes, the schedule allows differentiation through task type selection (fixed work, fixed duration, or fixed units). Additionally, the resource plan can display and adjust work by time unit, while the duration is displayed for reference. You can also choose whether to synchronise the schedule with the resource plan.

Request tool demo now