International TPG References by Industry

Some Important TPG Customers by Industry and Country



Aerospace & Defense
- Airbus (DE, FR, FI)
- BAE Systems (UK)
- General Dynamics (UK)
- Hampson Group (UK)
- Meggitt (UK)
- MT Aerospace (DE)
- QinetiQ (UK)
- Raytheon (UK)
- Rheinmetall (CH, DE, AT, CA)
- Sonardyne (UK)
- TDW (DE)

Automotive
- Continental (DE)
- Daimler TSS (DE)
- Dürr (DE)
- Goodyear (DE, US)
- Harman International (DE)
- Johnson Controls (DE)
- Knorr Bremse (DE)
- Nippon Seiki (DE)
- Recaro (DE)
- Rosenbauer (AT)
- Volkswagen (DE)

Engineering & Construction
- ABB (CH, DE)
- DESY (DE)
- General Electric (DE)
- Ges. für Schwerionenforschung (DE)
- Helmholzzentrum / GSI (DE)
- JCB (UK)
- MAN Diesel & Turbo (DE)
- NG Bailey (UK)
- Paul Scherrer Institut (CH)
- Sauter (CH)
- Schindler Aufzüge (CH)
- Siemens (DE, CH)
- voestalpine group-IT (AT)
- vonRoll (CH)

Professional Services
- ABA research (CH)
- Drees & Sommer International (DE)
- EWERK RZ (DE)
- GCT Garner (DE)
- incadea (DE)

Utilities
- Alpiq (CH)
- Axpo (CH)
- BKW (CH)
- E.ON Kraftwerke (DE)
- Energy Research Center (NL)
- Hydro Quebec (CA)
- Swissgrid (CH)
- UK Power Networks (UK)

Financial Services
- Credit Suisse (CH)
- First National Bank (ZA)
- G Research (UK)
- KfW Bankengruppe (DE)
- KPMG (CH)
- KV Niedersachsen (DE)
- LFA Förderbank Bayern (DE)
- Miller Insurance (UK)
- Münchener Verein (DE)
- WorldPay (UK)

Health Care
- Fisher Clinical Services (CH)
- MED-EL (AT)
- Sport Mental Academy (CH)
- Synlab (DE)
- Ultravision (UK)
- UniversitätsSpital Zürch (CH)

Retail & Consumer Goods
- Coop / Bell (CH)
- Emmi (CH)
- Grupo Leao (BR)
- Migros (CH)
- Mr. Price (ZA)
- Pentland (UK)

   IT & Telecommunications
- Botswana Telecom (BC)
- British Telecom (UK)
- Content & Code (UK)
- Die Post (CH)
- Dimension Data (ZA)
- ELM Information Securities (SA)
- Intel Mobile Communications (DE)
- Microsoft (CH)
- Minttulip (UK)
- Netcall (UK)
- Orange (UK)
- Oreedoo (QA)
- SAP (DE)
- Satellite Information Services (UK)
- Swisscom (CH)
- Xaar (UK)

Life Science & Chemicals
- Aspen Global (MP)
- Bausch & Lomb (DE)
- BTG (UK)
- Clariant (CH)
- DSM Nutritional Products (CH)
- Fresenius (DE)
- Kemira (FI)
- Lonza (UK)
- Novartis (CH)
- Rentschler Biotechnologie (DE)
- Saudi Basic Industries (SA)
- Weleda (CH)

Industrial Machinery & Components
- ABB (CH, DE)
- Bosch (BSH) Hausgeräte (DE)
- Braunschw. Maschinenbauanst. (DE)
- Elster (DE)
- Karl Storz (DE)
- Klüber Lubrication (DE)
- Messer Cutting Systems (DE)
- Oerlikon (CH)
- Otto Bock Healthcare (DE)
- TURCK Electronics (DE)
- Vaillant (DE)
- Viessmann (DE)

Public Sector
- Bundesbeschaffungsgesellschaft (AT)
- London Business School (UK)
- NATS (UK)
- St Marys Univesity (UK)
- Stadt Zürich (CH)
- University of Westminster (UK)
- Western Cape Government (ZA)

Oil, Gas & Mining
- Anglo American (ZA)
- AngloGold Ashanti (ZA)
- Exxaro (ZA)
- Grupo Votorantim (BR)
- Nigerian National Petroleum (NI)
- Qatargas (QA)

Travel & Transportation
- Essener Versorgungs- & Verkehrsges. (DE)
- Hamburg Port Authority (DE)
- Helsinki City Transport (FI)
- Irish Rail (EI)

Other Industries
- Heidelberg Cement (DE)
- Plansee (AT)
- Stora Enso (FI)
- Mediaprint (AT)
- Rodenstock (DE)
Microsoft Gold Certified Partner


“By integrating Project Server with SAP using TPG PSLink, we have been able to reduce the time needed for our regular budget planning from three man-weeks to one man-day.”
Helmut Kölbl, Sr. Program Mgr.,
Harman International

“The TPG solution currently automates some of our manual tasks. TPG ProjectLink aggregates all our detailed Microsoft Project plans into one overall project plan. TPG PSLink then transfers its structure and deadlines to SAP. The cost and work planning data from the detailed plans are directly integrated with SAP via TPG PSLink. This combination of products has made everything easier for us.”
Reiner Schwarz, Project Planning, Airbus

“TPG PSLink provides an accurate and efficient method of aligning Microsoft Project to the Primary SAP system in Corus’ Maintenance Planning. The product also is a suitable solution to effectively manage the high volume of data for a number of international Corus Sites throughout the UK and the Netherlands.”
Damon Owen, Project Manager, Tata Steel

“We’re also impressed with the TPG product performance – we schedule nightly synchronizations between Microsoft Project and SAP, but most jobs complete in less than 30 minutes even if we need to run them during the day.”
Kevin Hiebert , Tech Manager, AOL

“We chose TPG for the excellent quality of their PSLink product, but also due to PSLink’s very good cost-benefit ratio.”
Bill Courcha, Chairman,
BAE British Aerospace

“The top rate of 94% (A-supplier-status) of VDA 6.4 certification is to a high degree the result of the implementation of PSLink for synchronizing Microsoft Project with SAP …”
Horst R. Girrbach, Management-Responsible, Felsomat