Integration Product Microsoft Project with SAP
TPG PSLink® the world's leading integration product

 

TPG PSLink is the world’s leading and only SAP-certified product for the integration of Microsoft Project Server and SharePoint with SAP. The product exists for over 12 years already and includes a lot of lessons learned.

PSLink Integration Scenarios


TPG PSLink enables you to combine the advantages of the most popular project management software with those of the leading ERP system. Everyone works with whichever tool is best for them. Your day-today work efficiency increases, as our many TPG PSLink reference customers can confirm.

Data Exchange in Both Directions


SAP Module   Data
PS   - structures (WBS)
- networks
PM   - maintenance orders
- operations
- material components
CO   - internal orders
- activity input
- primary cost planning
- revenue forecast
- activity allocation
CATS   - actual postings
other modules   - flexible mapping

TPG PSLink enables the bidirectional data exchange between Microsoft Project and SAP. With its extensive checking mechanisms, TPG PSLink ensures the complete consistency of all of the shared data in the participating systems. A difference analysis shows you the changes in the data before they are written to the other system – and only these changes are transferred. This is what makes TPG PSLink so unique compared to other solutions.

Targeted Information for Accountancy Specialists

TPG PSLink is extensively configurable, enabling it to support clearly defined use cases in project management and accountancy. SAP is primarily used as the backend for financial controlling, while the project planning is conducted in Microsoft Project.

TPG PSLink supports PS objects like work breakdown structure (WBS) elements and network activities, but can also operate with CO, CATS and other modules directly. This makes TPG PSLink very flexible to be used in various scenarios including also those where SAP PS is not implemented.

This synchronization can be triggered manually on the client or scheduled on the TPG PSLink server, using the Windows Scheduling Service.

The Only SAP-certified Integration Product

The SAP Certification dated Mey 2009 is based on a scenario comprising seven central use cases with more than 40 business function calls. The scenario covers the functionalities within WBS structures, networks, maintenance orders, primary and secondary cost planning, CATS time sheets, CO allocation document postings, and actual cost synchronization. In addition, the performance of the product was validated for mass data interchange.

The Benefits of TPG PSLink® At-A-Glance

  1. Simplifies multiple tasks with streamlined, end-to-end project management processes
  2. Integrated project planning, cost accounting, collaboration and document management
  3. Eliminates need to manage data in 2 different systems
  4. Improved data quality for project leaders, accounting staff and management
  5. Multitenancy-enabled
  6. Mobile use of SAP data
The Features of TPG PSLink® At-A-Glance

  1. Very rapid implementation due to extensive configuration options
  2. Middleware with Web client and Microsoft Project add-in
  3. Comprehensive verification mechanisms for maximum reliability
  4. Full integration with the Microsoft Project Server security system
  5. Synchronization can be manual or automated with its own job queue administration
  6. Supports as many SAP systems, SAP clients and Project Server sites as required
  7. Multi-lingual interface
  8. Proven solution over many years with multiple customer references
  9. Works with Microsoft Project Server 2003/2007/2010, SharePoint 2007/2010, SAP/R3 4.6c and higher as well as ECC 6.0

This is what you can do

Click here for more infos/downloads

Get in contact with us for your individual on-line presentation of TPG PSLink.

Just write us an email or call us under +49 (89) 61 55 93-30.


  Print page            
Downloads / Infos
 
Testimonials
"In recent months we made a study and recognized that PSLink is the most suitable and trustworthy solution that exists in the market"
Rami Sartani, CIO & Director Information Systems & Technology of Elta/Israel

"With PSLink and TeamLink we achieved an integrated planning and controlling process that links Microsoft Project with SAP and gives us a phase, structure and responsibility based view of all our projects. This is crucial for our project management."
Guido Karkosch, Miele & Cie. KG

"The top rate of 94% (A-supplier-status) of VDA 6.4 certification is to a high degree the result of the implementation of PSLink for synchronizing Microsoft Project with SAP…”
Horst R. Girrbach, Management-Responsible, Felsomat GmbH & Co.KG

More PSLink References
AOL, USA
Atlas Elektronik, GER
BAE British Aerospace, GBR
Bentley Systems, USA
City of Braunschweig, GER
Cologne Public Transport, GER
DESY, GER
Dimension Data, ZA
EADS/TDW, GER
Felsomat, GER
Frequentis, A
GoodYear, USA
Harman International, USA
Heraeus, GER
Irish Rail, IRL
Israel Aircraft Industries, IL
Kayser-Threde, GER
Keiper Recaro, GER
MAN Diesel SE, GER
Miele Household Appliances, GER
Ministry of Finance, TH
MT Aerospace, GER
Nordex Wind Turbines, GER
Rentschler, GER
SGL Carbon, GER
Siemens  Building Tech., GER
Siemens Energy, GER
Tyco Electronics, USA
Varian Medical Systems, USA
etc.

 

 
Home
Deutsch
Contact
Sitemap
Imprint
Search